Customer challenge
The over 30 year-old powder coating system was no longer able to cope with the high demands for product manufacturing and the planned production figures. The specifications included the coating of all kinds of part geometries in anthracite and silver, a very high degree of automation with reserve capacity and reproducible, high-quality coating results. For the entire new system, it was planned to build a steel construction platform of around 4 metres in height in the production hall, which needed to accommodate all of the components. The space freed up below the podium was in future going to be used for welding and assembly work.